emblem
  • भारत सरकार
  • GOVT. OF INDIA
  • श्रम एवं रोजगार मंत्रालय
  • MINISTRY OF LABOUR AND EMPLOYMENT
  • खान सुरक्षा महानिदेशालय
  • DIRECTORATE GENERAL OF MINES SAFETY

Application

Approval Letter View

Approved No :- DGMS APPROVAL NO.-M_62191/3

NO: M-29020|62191|2025|Mechanical(HQ)                                                                                                                                                                                                                                                                                                                                                                                                Dhanbad, Date: 15/04/2025

DGMS APPROVAL NO.-M_62191/3

From

Director General of Mines Safety
Directorate General of Mines Safety,
P.O & Distt: Dhanbad - 826 016.

To

SRI VENKAT VARA PRASAD PIDIKITI, D C S LIMITED, PLOT NO. 169, ROAD NO. 11, PRASHASAN NAGAR, JUBILEE HILLS
Telangana, Hyderabad, HYDERABAD, 500096

Sub: Approval of Shaft Loader SL6 for Shaft sinking at Parasea-Belbaid Underground MDO Project-Regarding.

Dear Sir,

1. Please refer to your letter No. ID 62191 dated 16.01.2025, (ii) Field Trial Approval Letter No. FT_M_61967/5 Dated 29.08.2024 and subsequent correspondence on the above cited subject.

2. The matter has since been considered in light of what has been stated in application under reference, documents and reports submitted along with the application. I, by virtue of the powers conferred under Regulation 208(3) of the Coal Mines Regulation, 2017, hereby accord field trail approval of Shaft Loader equipment designated as SL6 Hydraulic Power Operated with associated FLP and Intrinsically Safe electrical equipment for use in Sinking shaft at Parasea-Belbad Colliery of M/s. Eastern Coalfields Limited for a period of 02 (Two)Years from the date of issue of this letter or Completion of the Sinking Projetc whichever is earlier subject to the conditions mentioned in the Annexure-I overleaf and the following Conditions.

  1. Two separate means of interchanging distinct and definite signals between the bottom and the top of the shaft shall be available.
  2. Frame Follow & Display Method and Code of Signalling to be used by persons travelling in a Bucket to Stop, Raise, Lower, Slower etc..

3. Compliance to the Para 2 a and 2 b shall be submitted wityhin 15 Days from the date ofmissue of this Approval failing which This Approval is deemed to be withdrawn without any further correspondence. Please note that the application for renewal of approval shall be made at least three months before the date of expiry of the approval.

Your Faithfully,

(UJJWAL TAH)
Director General of Mine Safety - (HQ)
Date : 29.08.2024

Annexure-I

Approval of Shaft Loader equipment designated as SL6 Hydraulic Power Operated with associated FLP and Intrinsically Safe electrical equipment used in sinking shaft at Parasea-Belbad Colliery of M/s. ECL with the following conditions:

1. The manufacturer of the shaft loader system shall be fully responsible for the quality of its components, its conformity with the design/drawings submitted in this Directorate. The material used in the manufacture shall generally be based on sound engineering practice and all the parts of the shaft loader shall be free from any cracks/defects of discontinuation.

2. The installation, operation and maintenance of the above equipment shall be carried out under the direct supervision of the manufacturer and in accordance with the relevant provisions of the Mines Act, 1952, Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023.

3. The efficient brakes shall be provided in all winches used for suspending the loader which is capable of holding the twice the static load in the system.

4. An efficient locking arrangement shall be provided in the winches while not operated.

5. All the winches shall be synchronized and can be operated simultaneously to prevent any slackness of rope. A slack rope protection device to all winches shall be provided.

6. The persons shall not be allowed at the bottom of shaft at the time of loading operation.

7. The signal man shall be adequately protected from the debris falling from bucket while hosting.

8. Before the loading operation commences, it shall be ensured that loader stabilizer equipment is properly placed in position in the shaft so that the load on the winches ropes is minimized. An interlocking between the loading mechanism and stabilizer shall be provided so that loading operation cannot be commenced until the stabilizer is properly engaged to its position to the shaft. The whole operation shall be under in charge of a competent person who always present at the time of operation.

9. The factor of safety of all suspended rope(s) shall not be less than 10 during installation and also during course of operation. The rope shall either confirm to IS 1855-2003/IS 3626-2001 (or its revised standard).

10. The life of the rope shall be fixed by the manager in consultation with engineer of the mine and shall also satisfy norms of discarding factors of the rope as per DG's Circular as mentioned below:

i) When reduction in diameter of rope is 10% of the original diameter.

ii) 10% reduction in diameter of rope is effected by corrosion of medium degree and extended to most of the portion.

iii) 10% reduction in diameter of rope anywhere along with length.

11. The capple used for fixing the suspended rope shall be treated as part of suspension gear of winding system and capple shall comply to the general order  No. DGMS/Mech/ Tech. Circular (Approval)/01 dated 13.02.2015 Issued by this Directorate.

12.  All Fire Resistant High pressure Hydraulic hoses shall comply DGMS/Mech/Technical Cir. (Approval)/ 04 dated 13.02.2015 and  Hydraulic Fluids shall comply to the general order to the DGMS/Mech/Technical (Approval)/02 dated 13.02.2015 respectively issued by this Directorate.

13. The electrical cables shall comply with the parameters and guidelines prescribed in the general order No. DGMS/Tech. Circular (Electrical) Approval/12 dates 25.05.2015 and amendment of general order No. DGMS/Tech. Circular (Electrical) Approval/1 dated 19.02.2016 issued by this Directorate.

14. All associated electrical items installed below ground shall adhere to Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023 and shall be FLP/Intrinsically safe, duly approved by this Directorate. (All the Electrical components associated in the system will be as per Annexure-II).

15. The cable entry devices, threaded adaptors and stopping plugs shall be suitable for the equipment and be consider as a part of equipment (not a component). The cable entry devices and cabling methods used in service shall be suitable for their intended duty and special type of cable used in mining. Such cable entry devices shall be duly certified as per relevant IS/IEC standards.

16. Non Destructive Test report of vital parts of shaft loader conducted at any govt. approved laboratory or a test house accredited by NABL/ASNT/ISNT at every three months and performance report of the equipment shall be kept available in the mine office.

17. Any modification on the equipment shall not be carried out without prior approval of this Directorate.

18. An officer of the DGMS may at any time draw a sample of components either from the factory or from the user and get it tested at the cost of the manufacturer. If the test report(s) is/are not satisfactory, this approval shall be deemed to be suspended.

19.The Pit bottom of the shaft shall be equipped with camera to have a clear view to the winch operator, about the condition of the Pit bottom.

20. Please note that above approval is also subject to the following additional conditions:

(a) If any time, any one of the conditions subject to which this approval has been granted is violated or not complied with, this approval shall be deemed to have been revoked with immediate effect.

(b) This approval is being issued without prejudice to any other provision of law that may be or become applicable.

                                                                                         

Annexure –II

 

Particulars of Electrical components associated with Shaft Loader equipment designated as SL6

 

Motor:

 

Sl. No.

Description of Motor

Name of manufacturer

Approval No. / Std. Ref.

1.

Flameproof motor 45KW in Frame Size E 225M confirming to IS-2148 2004 & IS 13346-2004

M/s Cropton Greaves Ltd., A-62-MICD, Ahmednagar-414111, Maharashtra

80 Group-1 of 1974 IS/IEC 60079-0:2004 & IS/IEC 60079-1:2007

2. Flameproof motor 75 KW in Frame Size 280 S confirming to IS-2148 2004 & IS 13346-2005

M/s Laxmi Hydraulics Pvt. Ltd., B-11 & B-16, M.I.D.C. Chincholi, Solapur 413 255 Maharashtra, India

557 of 2007 IS/IEC 60079-1:2014 and IS/IEC 60079-0:2017

 

 

Switchgear:

 

Sl. No.

Description of Motor

Name of manufacturer

Approval No. / Std. Ref.

1.

Flameproof drill control panel type ET /DCP for coalmines UG up to 2.5 KVA, 550/125/ 110V 1KVA lighting transormer

M/s Electroteknika Ltd., KMC 128, Bosepukur Prantik Pally, Kolkata -700042

512 of 2004 IS/IEC 60079-0: 2004 & IS/IEC 60079-1: 2007

2.

Flameproof Push Button Station type PB 330

Safex (India) Aashirwad Complex PO: Nag Nagar, Dhanbad-826004

474 of 2000 IS/IEC 60079-0: 2004 & IS/IEC 60079-1:2007

 

 

Lighting:

 

Sl. No.

Description of Motor

Name of manufacturer

Approval No. / Std. Ref.

1.

FLP Well Glass Light Fitting type LF-01

Safex (India) Aashirwad Complex PO: Nag Nagar, Dhanbad-826004

463 of 1999 IS/IEC 60079-0:2004 & IS/IEC 60079-1:2007

 

 

Your Faithfully,
(UJJWAL TAH)
Director General of Mine Safety - (HQ)
Date : 15/04/2025
THIS IS A SYSTEM GENERATED DOCUMENT, DOES NOT REQUIRE ANY SIGNATURE.
Back