emblem
  • भारत सरकार
  • GOVT. OF INDIA
  • श्रम एवं रोजगार मंत्रालय
  • MINISTRY OF LABOUR AND EMPLOYMENT
  • खान सुरक्षा महानिदेशालय
  • DIRECTORATE GENERAL OF MINES SAFETY

Application

Renewal Letter View

Approved Renewal No :- Ren_E_37
NO: E-29021|62650|2026|Electrical(HQ) Dhanbad, Date: 19.02.2026

DGMS Approval No. 752 of 2019

From
Director General of Mines Safety
Directorate General of Mines Safety,
P.O & Distt: Dhanbad - 826 016.
 
To
SOMNATH DUTTA MAJUMDAR, JOY GLOBAL (UK) LIMITED, JOY GLOBAL (UK) LIMITED 4 SWANWICK COURT ALFRETON DERBYSHIRE - DE55 7AS
Derbyshire, ALFRETON, ALFRETON, 0
Ref:- CIMFR test report nos. mentioned in Annexure-B.

Subject:Approval under Regulation 208(3) of the Coal Mines Regulations, 2017 Flameproof, weatherproof, and intrinsically Safe Electrical apparatus as detailed in Annexure-A conforming to IS/IEC 60079-0:2017, IS/IEC 60079-1:2014, and IS/IEC 60079-11:2023 associated with the Shuttle Car, Model:10SC32AB, manufactured by M/s. Joy Global (UK) Ltd for use in belowground Coal Mines-Renewal thereof

 
Dear Sir/Mam

Please refer to your online application No. E-29021|62650|2026|Electrical(HQ) dated 05/12/2025 on the above subject and test reports andother documents submitted therewith in this regard.

I, in exercise of powers conferred upon Chief Inspector of Mines (also designated as Director General of Mines Safety) under Regulation208(3) of the Coal Mines Regulations, 2017, hereby renew the approval (DGMS Approval No. 752 of 2019) granted vide this Directorate’s letter No. 483/302/EHQ dated 26.03.2019 for a further period of five years, i.e. up to 30.01.2031 for use in belowground Coal Mines. The conditions mentioned in the original approval, subsequent renewal letters, and the amendment approval (wherever applicable), issued vide letter no. E-29021/61840/2024/Electrical (HQ) dated 29.05.2024, shall be strictly complied with, and the test reports of all the electrical items covered under approval, conforming to the latest testing standards, shall be submitted within three months, if not submitted before. The OEM guidelines shall be adhered to, and spares supplied by OEM shall only be used while maintaining the machines in the interest of safety.

The application for renewal should be made at least three (03) months before the date of expiry of this approval.

Condition: The latest test report for the intrinsically safe apparatus, conforming to IS/IEC 60079-11:2023, may please be submitted to this Directorate within three (03) months from the date of issuance of this approval. In case the same is not received within the stipulated period, the approval may be reviewed, which could lead to its withdrawal.

Annexure – A

Flameproof, weatherproof, and intrinsically Safe Electrical apparatus as detailed in Annexure-A associated with the Shuttle Car, Model:10SC32AB, manufactured by M/s. Joy Global (UK) Ltd for use in belowground Coal Mines

S.N.

Description of the equipment

Manufacturer

Testing Laboratory

Test Certificate No. & Date

Standards by which the test is conducted

1

FLP 3 Phase Induction Motor, 15CB350J, 85KW, 950V, 4 POLE

ABB Motors and Mechanical Inc (formerly Baldor Electric Company)

 TestSafe Australia

 

IECEx TSA 06.0002X

Date:2022-06-23

IEC 60079-0:2017

IEC 60079-1:2014

2

FLP 3 Phase Induction Motor, 7EB320J, 24KW, 1050V, 4 POLE

ABB Motors and Mechanical Inc (formerly Baldor Electric Company)

SIRA Certification Service

CSA Group

United Kingdom

IECEx SIR 10.0154X

Date:2020-04-03

 

 

IEC 60079-0:2017

IEC 60079-1:2014

3

FLP 3 Phase Induction Motor, Frame EB250J, rated at 15KW,1050 V,4 pole

 

ABB Motors and Mechanical Inc (formerly Baldor Electric Company)

SIRA Certification Service

CSA Group

United Kingdom

IECEx SIR 11.0076X

Date:2023-09-11

 

IEC 60079-0:2017

IEC 60079-1:2014

4

FLP Enclosure for Cable Reeler Rated At 300A, 1100V

Joy Global Underground Mining LLC

United States of America

Eurofins E&E CML Limited

United Kingdom

IECEx CML 23.0084X

Date:2023-08-01

IEC 60079-0:2017

IEC 60079-1:2014

5

FLP Switch/Connection Box 

 MA001012-0018, 240V

 

Joy Global Underground Mining LLC, United States of America

Ex Testing and Certification Pty Ltd

Australia

IECEx ITA 10.0002X

Date:2023-05-30

 

IEC 60079-0:2017

IEC 60079-1:2014-06

6

TX5831 Insertion level switch

Trolex Ltd

CIMFR

CIMFR/TC/P/H734

Date:06.02.2013

 

As per the CIMFR test report no -CIMFR/TC/P/H734 date:06.02.2013, it is a reed switch powered by an intrinsically safe power supply source.

 

7

FLP Solenoid Valve, Type 5000013525, rated at 16.9W

Joy Global Underground Mining LLC, United States of America

Ex Testing and Certification Pty Ltd

Australia

IECEx TRA 16.0009X

Date:2023-08-03

IEC 60079-0:2017

IEC 60079-1:2014

8

FLP/WP LED Mining Luminaire, Type ML100,

12-24V AC/DC

Victor

Intertek Testing & Certification Limited

United Kingdom

IECEx ITS 08.0012

Date:2022-05-10

 

IEC 60079-0:2017

IEC 60079-1:2014

9

FLP/WP A40 Range Restrained of Connectors (Plug Socket, Plug

Coupler), 350A, 1300 Volts

Victor Products Limited

SGS Baseefa

Baseefa02ATEX0098U Issue 2

Date:20.12.2021

Baseefa02ATEX0099U Issue 1

Date:29.04.2021

EN IEC 60079-0: 2018

EN 60079-1: 2014

10

 

FLP LIGHT FITTINGS(HEAD LIGHT) ML102, 24V DC

Victor, UK

CSA Group Testing, Netherlands

SIRA 09ATEX1328

Sept-2021

 

EN IEC 60079-0:2018;

EN 60079-1:2014

11

FLP Siren, Model-HSHC, rated at 110V AC

Hytronic (Pty) Ltd

South Africa

South Africa Mining and Surface Certification (MASC)

South Africa

 

IECEx ICS 17.0003X

Date: 2023-10-25

IEC 60079-0:2017

IEC 60079-1:2014

IEC 60079-11:2023

12

Flameproof SWITCH /Connection Box Type:5000016252

Joy Global Underground Mining LLC, United States of America

Eurofins E&E CML Limited

United Kingdom

IECEx CML 16.0002

Date: 2023-10-31

IEC 60079-0:2017

IEC 60079-1:2014

 

13

FLP Lens Assembly, Type-5000010113

Joy Global Underground Mining LLC, United States of America

SIRA Certification Service

CSA Group

United Kingdom

IECEx SIR 06.0024U

Date:2020-10-01

IEC 60079-0:2017

IEC 60079-1:2014

 

14

 

FLP Connection Box, Type 5100019785, rated at 3300V, 250A

Joy Global Underground Mining LLC, United States of America

Ex Testing and Certification Pty Ltd

Australia

IECEx ITA 15.0016

Date:2019-03-08

 

IEC 60079-0:2017

IEC 60079-1:2014

 

15

FLP Connection Box, Type-5000000788, rated at 3300V, 250A

Joy Global Underground Mining LLC, United States of America

 

Eurofins E&E CML Limited

United Kingdom

IECEx CML 15.0086

Date:2024-02-29

IEC 60079-0:2017

IEC 60079-1:2014

 

16

Controller Main ,Type no- 5000037849

Joy Global Underground Mining LLC, United States of America

 

Eurofins E&E CML Limited

United Kingdom

IECEx CML 20.0114X

Date:2020-08-24

IEC 60079-0:2017

IEC 60079-1:2014

 

17

Switch Enclosure, MA001012-0014

Joy Global Underground Mining LLC, United States of America

Ex Testing and Certification Pty Ltd

Australia

IECEx TRA 16.0010X

Date:2024-03-26

 

IEC 60079-0:2017

IEC 60079-1:2014

 

18

Barrier IS Digital, IM1-451EX-R, Part No-100609490

Hans Turck GmbH & Co. KG

Germany

TÜV NORD CERT GmbH

Germany

IECEx TUN 06.0007X
Date: 2022-04-20

IEC 60079-0:2017;
IEC 60079-11:2011

 

  1. Note : In the original DGMS Approval No. 752 of 2019 vide this Directorate's letter No. 483/302/EHQ dated 26.03.2019, the item "FLP Light Fittings (Head Light), Model: FSR1,24VDC.as mentioned at Serial No. 10, has now been replaced with "FLP LIGHT FITTINGS(HEAD LIGHT) ML102, 24V DC, as FLP LIGHT FITTINGS(HEAD LIGHT) ML102, 24V DC has been successfully trialled and which has already been approved under DGMS Approval Numbers DGMS Approval Nos. 4691/2020, 756 of 2019, 829 of 2024, and 714 of 2016.
  2. As requested by the applicant, In the original DGMS Approval No. 752 of 2019 vide this Directorate's letter No. 483/302/EHQ dated 26.03.2019 , the item “FLP Stop/Start Unit-Model SS1, rated at 18V,” mentioned at Serial No. 12, has been replaced with “Flameproof SWITCH /Connection Box Type:5000016252,” since the said item has already been field-trialed and was considered under DGMS Approval No. 714 of 2016.

 

 
Your Faithfully,
(UJJWAL TAH)
Director General of Mine Safety - (HQ)
Date : 19.02.2026
THIS IS A SYSTEM GENERATED DOCUMENT, DOES NOT REQUIRE ANY SIGNATURE.
Back